Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23
- Nov 15, 2022 Start date
- Closed Status
- None Intervenors
- None Presenters
- None Next hearing
- Application filed Nov 15, 2022 Completed
- Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Part I GRA Filing Due Nov 15, 2022 Completed
- Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Intervener Applications Due Nov 24, 2022 Completed
- Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Pre-Hearing Conference Dec 5, 2022 Completed
- Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Amended Part I GRA Filing Due Dec 9, 2022 Completed
- Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Part II GRA Filing Due Dec 21, 2022 Completed
- Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Pre-Hearing Conference Apr 6, 2023 Completed
- Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Hearing Commences May 15, 2023 Completed
- Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Public Presentations May 16, 2023 Completed
- Closed Aug 29, 2024 Completed
Off air
Application
| Title | Type | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Application | Nov 15, 2022 | Application | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Correspondence
Exhibit
| Title | Type | ||
|---|---|---|---|
| Manitoba Hydro (MH) Exhibits – September 27, 2023 letter – to PUB re: Redactions Lifted from PUB-MH II-11a-b Attachment 1, CSI Undertaking 1 and DEA-4 | Sep 27, 2023 | Exhibit | |
| Final Exhibit List (as of June 26, 2023) | Jun 26, 2023 | Exhibit | |
| MH-58 – MH Written Reply – June 25, 2023 | Jun 25, 2023 | Exhibit | |
| AMC-9 – AMC Written Final Submission – June 22, 2023 | Jun 22, 2023 | Exhibit | |
| CC-33 – CC Closing Submission Presentation – June 22, 2023 | Jun 22, 2023 | Exhibit | |
| CC-34 – CC Written Legal Argument – June 22, 2023 | Jun 22, 2023 | Exhibit | |
| CC-35 – CC Written Submission on Business Operation Capital – June 22, 2023 | Jun 22, 2023 | Exhibit | |
| GSS-GSM-12 – GSS-GSM Closing Submission Presentation – June 22, 2023 | Jun 22, 2023 | Exhibit | |
| GSS-GSM-13 – GSS-GSM Closing Written Argument – June 22, 2023 | Jun 22, 2023 | Exhibit | |
| MIPUG-23 – MIPUG Final Written Submissions – June 22, 2023 | Jun 22, 2023 | Exhibit | |
| MKO-5 – MKO Final Argument – June 22, 2023 | Jun 22, 2023 | Exhibit | |
| CC-15 – Midgard Consulting Presentation – May 24, 2023 – Amended May 31, 2023 & June 21, 2023 | Jun 21, 2023 | Exhibit | |
| MH-56 – MH Oral Final Submission Presentation – June 19, 2023 | Jun 19, 2023 | Exhibit | |
| MH-57 – MH Final Written Argument – June 19, 2023 | Jun 19, 2023 | Exhibit | |
| MH-54 – Undertakings 25, 28, 40, 55 and 57-62 Responses – June 16, 2023 | Jun 16, 2023 | Exhibit | |
| CC-32 – Responses to Undertakings 64, 65 and Attachments 1-4, 66-69 – June 14, 2023 | Jun 14, 2023 | Exhibit | |
| CC-29 – Response to Undertaking # 45 – June 12, 2023 | Jun 12, 2023 | Exhibit | |
| CC-30 – Response to Undertaking # 46 – June 12, 2023 | Jun 12, 2023 | Exhibit | |
| CC-31 – Response to Undertaking # 50 – June 12, 2023 | Jun 12, 2023 | Exhibit | |
| MIPUG-22 – Gerdau Undertaking Response – June 12, 2023 | Jun 12, 2023 | Exhibit | |
| MH-53 – Undertakings 27, 30, 33, 42, 54, 56, 63 and from page 3532 of the transcript Responses – June 9, 2023 | Jun 9, 2023 | Exhibit | |
| CC-28 – Aids to Cross Examination of P. Bowman – June 8, 2023 | Jun 8, 2023 | Exhibit | |
| MIPUG-21 – Patrick Bowman Direct Evidence Presentation – June 8, 2023 | Jun 8, 2023 | Exhibit | |
| MH-52 – Undertakings 19-20, 23, 32, 39, 41, 43-44, 51-52, Page 2194 and Updated 7 Responses – June 7, 2023 | Jun 7, 2023 | Exhibit | |
| PUB-29 – Aids to Cross Examination – Legislative Excerpts – Cost of Service – June 7, 2023 | Jun 7, 2023 | Exhibit | |
| CC-24 – June 18, 2004 Standing Committee Hansard – June 7, 2023 | Jun 7, 2023 | Exhibit | |
| CC-25 – 2020-21 Neighbors Helping Neighbors Annual Report – June 7, 2023 | Jun 7, 2023 | Exhibit | |
| CC-26 – MPA Response to Undertaking 53 – June 7, 2023 | Jun 7, 2023 | Exhibit | |
| CC-27 – Kelly Derksen – Direct Evidence Presentation – June 7, 2023 | Jun 7, 2023 | Exhibit | |
| GSS-GSM-9 – Undertaking # 47 Response – June 7, 2023 | Jun 7, 2023 | Exhibit | |
| GSS-GSM-10 – Undertaking # 48 Response – June 7, 2023 | Jun 7, 2023 | Exhibit | |
| GSS-GSM-11 – Undertaking # 49 Response – June 7, 2023 | Jun 7, 2023 | Exhibit | |
| MIPUG-20 – MIPUG Aids to Cross Examination of Rates and Cost of Service Panel – June 7, 2023 | Jun 7, 2023 | Exhibit | |
| MH-50 – MH Witness Qualifications – Rates and Cost of Service Evidence Panel – June 6, 2023 | Jun 6, 2023 | Exhibit | |
| MH-51 – MH Rates and Cost of Service Panel – June 6, 2023 | Jun 6, 2023 | Exhibit | |
| CC-23 – Pelino Colaiacovo of Morrison Park Advisors Presentation – June 6, 2023 | Jun 6, 2023 | Exhibit | |
| MIPUG-17 – Aid to Cross – BC Hydro May 29, 2023 letter – June 6, 2023 | Jun 6, 2023 | Exhibit | |
| MIPUG-19 – Chemtrade Undertaking Response – June 6, 2023 | Jun 6, 2023 | Exhibit | |
| MH-48 – MH Witness Qualifications – Depreciation Concurrent Evidence Panel – June 5, 2023 | Jun 5, 2023 | Exhibit | |
| MH-49 – MH Depreciation Position Overview – June 5, 2023 | Jun 5, 2023 | Exhibit | |
| PUB-25 – Depreciation Presentation – June 5, 2023 | Jun 5, 2023 | Exhibit | |
| PUB-26 – CV of Ian Innis – June 5, 2023 | Jun 5, 2023 | Exhibit | |
| PUB-27 – BC Hydro Revenue Requirements Application – Excerpts – June 5, 2023 | Jun 5, 2023 | Exhibit | |
| PUB-28 – OPG – Depreciation Study – June 5, 2023 | Jun 5, 2023 | Exhibit | |
| GSS-GSM-8 – Dustin Madsen – Emrydia – Depreciation Presentation – June 5, 2023 | Jun 5, 2023 | Exhibit | |
| MIPUG-15 – Patrick Bowman – Depreciation Presentation – June 5, 2023 | Jun 5, 2023 | Exhibit | |
| MIPUG-16 – SCP Certification main page – June 5, 2023 | Jun 5, 2023 | Exhibit | |
| MH-47 – Undertaking 10-13, 16 &, 17-18, 24, 26, 29, 31, 34-38 & from page 1516 & Responses – June 2, 2023 | Jun 2, 2023 | Exhibit | |
| CC-21 – May 19, 2023 letter – CFIB urges the Manitoba government to cancel plans to hike Manitoba Hydro rates – June 2, 2023 | Jun 2, 2023 | Exhibit | |
| CC-22 – CC letter to PUB re: Rebuttal Evidence by AMCL dated May 19, 2023 – June 2, 2023 | Jun 2, 2023 | Exhibit | |
| GSS-GSM-7 – Dustin Madsen – Emrydia Consulting Corporation Direct Evidence Presentation – June 2, 2023 | Jun 2, 2023 | Exhibit | |
| MH-44 – Transcript from April 29, 2019 – 2019-20 Electric Rate Application – June 1, 2023 | Jun 1, 2023 | Exhibit | |
| MH-45 – Transcript pages from 2015/16 & 2016/17 GRA – June 1, 2023 | Jun 1, 2023 | Exhibit | |
| MH-46 – Transcript from March 20, 2014 – NFAT – June 1, 2023 | Jun 1, 2023 | Exhibit | |
| CC-20 – Darren Rainkie Direct Evidence Presentation – June 1, 2023 | Jun 1, 2023 | Exhibit | |
| MH-43 – Undertaking # 22 Response – May 31, 2023 | May 31, 2023 | Exhibit | |
| MIPUG-14 – MNP November 9, 2018 – Audit of Management Staff Reduction – May 31, 2023 | May 31, 2023 | Exhibit | |
| CC-18 – Aids for Cross Examination – Revenue Requirement Panel – May 30, 2023 | May 30, 2023 | Exhibit | |
| CC-19 – Smart Metering Initiative Chapter 3 Audit AMI – May 30, 2023 | May 30, 2023 | Exhibit | |
| MH-42 – MH Revenue Requirement Presentation – May 29, 2023 | May 29, 2023 | Exhibit | |
| MH-41 – MH Revenue Requirement Panel Qualifications – May 28, 2023 | May 28, 2023 | Exhibit | |
| DEA-5 – Daymark Subject to Check – from May 19, 2023 Response – May 26, 2023 | May 26, 2023 | Exhibit | |
| MH-37 – Statistic Canada – Industrial product price index, by major product group, monthly – May 25, 2023 | May 25, 2023 | Exhibit | |
| MH-38 – Statistic Canada – Machinery and equipment price index, by commodity quarterly – Q1 2020-2023 – May 25, 2023 | May 25, 2023 | Exhibit | |
| MH-39 – Undertakings # 9, 14 and 15 Responses – May 25, 2023 | May 25, 2023 | Exhibit | |
| MH-40 – Updated Response to Coalition-MH I-92a-d – May 25, 2023 | May 25, 2023 | Exhibit | |
| CC-16 – Appendix A – Willingness to Pay Survey – May 25, 2023 | May 25, 2023 | Exhibit | |
| MH-36 – Undertakings # 2 and 4 Responses – May 24, 2023 | May 24, 2023 | Exhibit | |
| MIPUG-13 – Book of Documents – May 24, 2023 | May 24, 2023 | Exhibit | |
| MH-32 – MH Asset Management Panel Qualifications – May 23, 2023 | May 23, 2023 | Exhibit | |
| MH-33 – Asset Management and Capital Direct Evidence Presentation – May 23, 2023 | May 23, 2023 | Exhibit | |
| MH-34 – AMCL Manitoba Hydro Maturity Assessment Summary Presentation – May 23, 2023 | May 23, 2023 | Exhibit | |
| MH-35 – Undertakings # 3, 5, 6, 7 and 8 Responses – May 23, 2023 | May 23, 2023 | Exhibit | |
| CC-13 – Aids for Cross Examination – Asset Management Panel – Board Orders – May 19, 2023 | May 19, 2023 | Exhibit | |
| MH-31 – Undertaking # 1 – False Claims of Indigenous Identity – May 17, 2023 | May 17, 2023 | Exhibit | |
| PUB-23 – Bill 20 – The Crown Corporations Governance and Accountability Act – May 17, 2023 | May 17, 2023 | Exhibit | |
| MIPUG-12 – PUB/MH II-57 Revised from the 2017/18 & 2018/19 GRA – May 17, 2023 | May 17, 2023 | Exhibit | |
| MH-30 – MH Export, Drought Management and Hydrology Presentation – May 16, 2023 | May 16, 2023 | Exhibit | |
| PUB-22 – Exhibit MH-25 Direct Evidence from 2019/20 GRA – May 16, 2023 | May 16, 2023 | Exhibit | |
| MH-26 & 27 – MH Policy Witness Panel Qualifications CV’s for J. Grewal and A. Tess – May 15, 2023 | May 15, 2023 | Exhibit | |
| MH-28 – MH Policy Presentation – May 15, 2023 | May 15, 2023 | Exhibit | |
| MH-29 – MH Export, Drought Management and Hydrology Witness Panel Qualifications CV’s for H. Turner, N. Karanwal, K. Gawne and C. Sanclemente – May 15, 2023 | May 15, 2023 | Exhibit | |
| MIPUG-11 – MIPUG Opening Statement – May 15, 2023 | May 15, 2023 | Exhibit | |
| MKO-4 – MKO Opening Statement – May 15, 2023 | May 15, 2023 | Exhibit | |
| DEA-3 – Daymark CV’s John Athas, Douglas Smith and Jeffrey Bower – May 15, 2023 | May 15, 2023 | Exhibit | |
| MH-25 – MH Affidavit of Publication and Service of Notice of Public Hearing – May 10, 2023 | May 10, 2023 | Exhibit | |
| PUB-20 – Depreciation Issues Document – May 10, 2023 | May 10, 2023 | Exhibit | |
| MH-24 – MH Rebuttal Evidence – May 5, 2023 | May 5, 2023 | Exhibit | |
| PUB-21 – Winnipeg Free Press Article – May 3, 2023 page A8 – Saskatchewan looking into whether Ottawa’s emissions policy can be blocked, Moe says | May 3, 2023 | Exhibit | |
| CC-9 CC-9-1 – Consumers Coalition Intervener Evidence – Review of Certain MH Financial Issues – MPA Morrison Park Advisors Inc. – April 3, 2023 Errata MPA Report – April 28, 2023 | Apr 28, 2023 | Exhibit | |
| MIPUG-10 – MIPUG Reply Submission on P. Bowman Recommendation #4 – April 26, 2023 | Apr 26, 2023 | Exhibit | |
| MH-22 – MH letter re: P. Bowman Recommendation #4 – April 21, 2023 | Apr 21, 2023 | Exhibit | |
| AMC-5 – AMC Submissions on P. Bowman Recommendation #4 – April 21, 2023 | Apr 21, 2023 | Exhibit | |
| CC-11 – Consumers Coalition Submission on P. Bowman Recommendation #4 – April 21, 2023 | Apr 21, 2023 | Exhibit | |
| GSS-GSM-6 – GSS-GSM Submission on P. Bowman Recommendation #4 – April 21, 2023 | Apr 21, 2023 | Exhibit | |
| MIPUG-9 – MIPUG Comments on P. Bowman Recommendation #4 – April 21, 2023 | Apr 21, 2023 | Exhibit | |
| DEA-2 – Daymark Independent Expert Consultant Report: Export Revenues and Drought Operations – April 13, 2023 | Apr 13, 2023 | Exhibit | |
| MH-18 – MH letter to PUB re: MH Comments on Pre Hearing Conference #2 – April 5, 2023 | Apr 5, 2023 | Exhibit | |
| MIPUG-7 – MIPUG letter to PUB re: Pre Hearing Conference #2 – April 5, 2023 | Apr 5, 2023 | Exhibit | |
| CC-7 – Consumers Coalition Intervener Evidence – Revenue Requirement – Darren Rainkie – April 3, 2023 | Apr 3, 2023 | Exhibit | |
| CC-8 – Consumers Coalition Intervener Evidence – Midgard Consulting Incorporated – April 3, 2023 | Apr 3, 2023 | Exhibit | |
| CC-10 – Consumers Coalition Intervener Evidence – Kelly Derksen – April 3, 2023 | Apr 3, 2023 | Exhibit | |
| GSS-GSM-5 – Written Intervener Evidence – Dustin Madsen – Emrydia Consulting Corporation – April 3, 2023 | Apr 3, 2023 | Exhibit | |
| PUB-12 – PUB letter to all Parties re: Daymark Scope of Work Confirmation – March 13, 2023 | Mar 13, 2023 | Exhibit | |
| MH-17 – MH letter to PUB re: Responses to Round II Information Requests – March 10, 2023 | Mar 10, 2023 | Exhibit | |
| PUB-11 – PUB letter to MH and Interveners re: Pre Hearing Conference #2 – April 6, 2023 – March 9, 2023 | Mar 9, 2023 | Exhibit | |
| DEA-1 – DEA letter re: Formal Information Requests to MH – March 8, 2023 | Mar 8, 2023 | Exhibit | |
| MH-16 – MH to PUB re: Updated PUB-MH I-74a-b IR Responses – March 3, 2023 | Mar 3, 2023 | Exhibit | |
| MH-15 – MH to PUB re: Updated Coalition-MH I-91 IR Response – March 1, 2023 | Mar 1, 2023 | Exhibit | |
| MH-14 – MH to PUB re: Updated Round I IR Responses ( and I-91e) – February 21, 2023 | Feb 21, 2023 | Exhibit | |
| CC-5 – CC Letter re: Motion of the CC to compel further responses to Round I IRs – February 14, 2023 | Feb 14, 2023 | Exhibit | |
| MH-11 – MH Reply to Coalition Motions on Round I Information Request Responses – February 13, 2023 | Feb 13, 2023 | Exhibit | |
| MH-12 – MH to PUB re: Revised Round I IR Response (Coalition-MH I-131a-e) – February 13, 2023 | Feb 13, 2023 | Exhibit | |
| MH-13 – MH to PUB re: Updated Round I IR Response (MIPUG-MH I-101a-f) – February 13, 2023 | Feb 13, 2023 | Exhibit | |
| PUB-8 – PUB letter to MH and Interveners re: Round I Information Request Response Motion – February 9, 2023 | Feb 9, 2023 | Exhibit | |
| CC-4 – CC Motion re Round I Information Requests – February 8, 2023 | Feb 8, 2023 | Exhibit | |
| MH-10 – MH letter to PUB re: Round I Information Request Responses – February 3, 2023 | Feb 3, 2023 | Exhibit | |
| MH-9 – MH letter to PUB re: MH 2023/24 & 2024/25 GRA – Corrections – February 2, 2023 | Feb 2, 2023 | Exhibit | |
| PUB-7 – PUB letter to MH and Interveners re: Daymark Retainer – January 31, 2023 | Jan 31, 2023 | Exhibit | |
| MH-8 – MH letter to PUB re: Response to Interveners for Round I Information Request Objections – January 16, 2023 | Jan 16, 2023 | Exhibit | |
| CC-3 – CC letter to MH re: Round I Information Requests Objections – January 13, 2023 | Jan 13, 2023 | Exhibit | |
| PUB-5 – PUB letter to MH and Interveners re: Manitoba Hydro 2023/24 GRA – MH January 9, 2023 letter re: Information Requests – January 10, 2023 | Jan 10, 2023 | Exhibit | |
| MH-7 – MH letter to PUB re: Round I Phase 1 Information Requests – January 9, 2023 | Jan 9, 2023 | Exhibit | |
| MH-6 – MH letter to PUB re: Manitoba Hydro’s 2023/24 & 2024/25 General Rate Application – Phase 2 – December 21, 2022 | Dec 21, 2022 | Exhibit | |
| MH-5 – MH letter to PUB re: Amended Application Materials and Minimum Filing Requirements – December 9, 2022 | Dec 9, 2022 | Exhibit | |
| MH-4 – Pre-Hearing Conference Presentation – December 5, 2022 | Dec 5, 2022 | Exhibit | |
| MIPUG-2 – Pre-Hearing Conference 1 – MIPUG Comments – December 5, 2022 | Dec 5, 2022 | Exhibit | |
| MH-3 – MH letter to PUB re: Comments on Intervener Status Applications for the MH 2023 General Rate Application – November 30, 2022 | Nov 30, 2022 | Exhibit | |
| MH-2 – MH letter to PUB re: Update to Manitoba Hydro’s 2023 General Rate Application – November 29, 2022 | Nov 29, 2022 | Exhibit | |
| AMC-1 – AMC Intervener Application – November 24, 2022 | Nov 24, 2022 | Exhibit | |
| CC-1 – CC Intervener Application – November 24, 2022 including Attachments | Nov 24, 2022 | Exhibit | |
| GSS-GSM-1 – GSS-GSM Intervener Application – November 24, 2022 | Nov 24, 2022 | Exhibit | |
| MIPUG-1 – MIPUG Intervener Application – November 24, 2022 including Attachments | Nov 24, 2022 | Exhibit | |
| MKO-1 – MKO Intervener Application – November 24, 2022 | Nov 24, 2022 | Exhibit | |
| PUB-2 – PUB letter to MH and Past Interveners re: Manitoba Hydro 2023/24-2024/25 GRA – Applications for Intervener Status and Pre-Hearing Conference – November 16, 2022 | Nov 16, 2022 | Exhibit | |
| PUB-19-1 – Board Counsel Book of Documents – Volume 1 – Policy | Exhibit | ||
| PUB-19-2 – Board Counsel Book of Documents – Volume 2 – Drought Management, Export and Hydrology | Exhibit | ||
| PUB-19-3 – Board Counsel Book of Documents – Volume 3 – Asset Management and Capital | Exhibit | ||
| PUB-19-4 – Board Counsel Book of Documents – Volume 4 – Revenue Requirement | Exhibit | ||
| PUB-19-5 – Board Counsel Book of Documents – Volume 5 – Depreciation | Exhibit | ||
| PUB-19-6 – Board Counsel Book of Documents – Volume 6 – Cost of Service & Rate Design | Exhibit | ||
| PUB-24 – Excerpts from 2017/18 & 2018/19 GRA – PUB-MH II-34 | Exhibit | ||
| AMC-7 – 2022 Annual Planning Outlook from IESO | Exhibit | ||
| AMC-8 – MISO’s 2022/23 Planning Resource Auction Results | Exhibit | ||
| CC-12 – Opening Submissions of the Consumers Coalition | Exhibit | ||
| CC-14 – Excerpts from MH-36 2014-15 and 2015-16 GRA | Exhibit | ||
| Scope of Work | Exhibit | ||
Information Requests
| Title | Type | ||
|---|---|---|---|
| Round I – PUB-MH I 1-177 | Information Requests | ||
| Round I – AMC-MH I 1-46 | Information Requests | ||
| Round I – CC-MH I 1-161 | Information Requests | ||
| Round I – GSS-GSM-MH I 1-14 | Information Requests | ||
| Round I – MIPUG-MH I 1-120 | Information Requests | ||
| Round I – MKO-MH I 1-16 | Information Requests | ||
| Round II – PUB-MH II 1-64 | Information Requests | ||
| Round II – AMC-MH II 1-12 | Information Requests | ||
| Round II – CC-MH II 1-139 | Information Requests | ||
| Round II – GSS-GSM-MH II 1-7 | Information Requests | ||
| Round II – MIPUG-MH II 1-33 | Information Requests | ||
| Round II – MKO-MH II 1-2 | Information Requests | ||
| Intervener Evidence IRs – PUB-CC I 1-37 | Information Requests | ||
| Intervener Evidence IRs – PUB-GSS-GSM I 1-8 | Information Requests | ||
| Intervener Evidence IRs – PUB-MIPUG I 1-15 | Information Requests | ||
| Intervener Evidence IRs – MH-CC I 1-29 | Information Requests | ||
| Intervener Evidence IRs – MH-GSS-GSM I 1-3 | Information Requests | ||
| Intervener Evidence IRs – MH-MIPUG I 1-7 | Information Requests | ||
| Intervener Evidence IRs – AMC-CC I 1-6 | Information Requests | ||
| Intervener Evidence IRs – MIPUG-CC I-7 | Information Requests | ||
| Independent Expert Evidence IRs – PUB-DEA I 1-15 | Information Requests | ||
| Independent Expert Evidence IRs – MH-DEA I 1-1 | Information Requests | ||
| Independent Expert Evidence IRs – AMC-DEA I 1-14 | Information Requests | ||
Intervener Application Forms
| Title | Type | ||
|---|---|---|---|
| Intervener Cost Policy | Intervener Application Forms | ||
| Intervener Cost Policy – Appendix A (Rates) – Updated 2023 | Intervener Application Forms | ||
| Intervener Cost Policy – Appendix A (Rates) – Updated 2024 | Intervener Application Forms | ||
| Intervener Application Form | Intervener Application Forms | ||
| Example of Intervener Cost Form | Intervener Application Forms |
Public Participation
Public Presentations
| Title | Type | ||
|---|---|---|---|
| Bailey Wall (Rent Relief Fund – Manitoba Non-Profit Housing Association) 9:50 AM | May 16, 2023 | Public Presentations | |
| Dale Bossons & Rick Zetariuk (ChemTrade) 10:40 AM | May 16, 2023 | Public Presentations | |
| Jeff Anthofer (Gerdau Amersteel Corporation) 11:00 AM | May 16, 2023 | Public Presentations | |
| Rachel Halsted & Bradley Carter (TransCanada Energy) 11:20 AM | May 16, 2023 | Public Presentations | |
| Morgan Curran-Blaney (Maple Leaf) 11:40 AM | May 16, 2023 | Public Presentations | |
| Dan Hotel (Canadian Kraft Paper) 12:00 PM | May 16, 2023 | Public Presentations |
Review and Vary Board Order
| Title | Type | ||
|---|---|---|---|
| Manitoba Hydro Request to Review and Vary Directive 27 of Board Order 101/23 – Workshop on Enterprise Performance Management and Key Performance Indicators – August 14, 2024 | Aug 14, 2024 | Review and Vary Board Order | |
| MH Reply to Intervener Submissions – April 19, 2024 | Apr 19, 2024 | Review and Vary Board Order | |
| Consumers Coalition Response to PUB letter April 15, 2024 – April 18, 2024 | Apr 18, 2024 | Review and Vary Board Order | |
| GSS-GSM Response to PUB letter April 15, 2024 – April 18, 2024 | Apr 18, 2024 | Review and Vary Board Order | |
| MIPUG Response to PUB letter April 15, 2024 – April 18, 2024 | Apr 18, 2024 | Review and Vary Board Order | |
| PUB letter to Parties re: Deadline for Final Submissions on Manitoba Hydro’s Application to Review and Vary Order 101/23 – April 15, 2024 | Apr 15, 2024 | Review and Vary Board Order | |
| MH Reply to Interveners Procedural Comments – April 4, 2024 | Apr 4, 2024 | Review and Vary Board Order | |
| Manitoba Hydro Request to Review and Vary Directive 19 of Board Order 101/23 on Depreciation Matters – March 22, 2024 | Mar 22, 2024 | Review and Vary Board Order | |
| PUB letter to Parties re: Procedural Submissions on Manitoba Hydro’s Application to Review & Vary Board Order 101/23 – March 22, 2024 | Mar 22, 2024 | Review and Vary Board Order |
Transcript
| Title | Type | ||
|---|---|---|---|
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – June 26, 2023 (Pages 4522 to 4530) | Jun 26, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – June 22, 2023 (Pages 4253 to 4521) | Jun 22, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – June 19, 2023 (Pages 4151 to 4252) | Jun 19, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – June 9, 2023 (Pages 3940 to 4150) | Jun 9, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – June 8, 2023 (Pages 3754 to 3939) | Jun 8, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – June 7, 2023 (Pages 3537 to 3753) | Jun 7, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – June 6, 2023 (Pages 3274 to 3536) | Jun 6, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – June 5, 2023 (Pages 2999 to 3273) | Jun 5, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – June 2, 2023 (Pages 2854 to 2998) | Jun 2, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – June 1, 2023 (Pages 2576 to 2853) | Jun 1, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – May 31, 2023 (Pages 2485 to 2575) | May 31, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – May 30, 2023 (Pages 2209 to 2484) | May 30, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – May 29, 2023 (Pages 1948 to 2208) | May 29, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – May 25, 2023 (Pages 1652 to 1947) | May 25, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – May 24, 2023 (Pages 1378 to 1651) | May 24, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – May 23, 2023 (Pages 1137 to 1377) | May 23, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – May 19, 2023 (Pages 1089 to 1136) | May 19, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – May 18, 2023 (Pages 887 to 1089) | May 18, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – May 17, 2023 (Pages 686 to 886) | May 17, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – May 16, 2023 (Pages 396 to 685) | May 16, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Applicationn – Public Hearing – Transcript – May 15, 2023 (Pages 1 to 395) | May 15, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Application – Pre Hearing Conference’s – Transcript – April 6, 2023 (Pages 1 to 113) | Apr 6, 2023 | Transcript | |
| Manitoba Hydro’s 2023/24 & 2024/25 General Rate Application – Pre Hearing Conference’s – Transcript – December 5, 2022 (Pages 1 to 133) | Dec 5, 2022 | Transcript |
Take part in this proceeding
Two ways for the public to be heard.
| Order | Type | Description | ||
|---|---|---|---|---|
| 103/24 | Aug 29, 2024 | Review and Vary | Order Approving in Part Manitoba Hydro's Application to Review and Vary Directive 27 of Order 101/23 (Enterprise Performance Management and Key Performance Indicators) | |
| 51/24 | Apr 30, 2024 | Review and Vary | Order in Respect of an Application by Manitoba Hydro to Review and Vary Order 101/23 | |
| 104/23 | Aug 31, 2023 | General | Order Approving September 1, 2023 and April 1, 2024 Rate Schedules for Manitoba Hydro | |
| 101/23 | Aug 24, 2023 | General | Final Order with Respect to Manitoba Hydro’s 2023/24 and 2024/25 General Rate Application | |
| 88/23 | Jul 27, 2023 | General | Sixth Procedural Order in Respect of Manitoba Hydro’s 2023/24 and 2024/25 General Rate Application (Adjudication of Residual Claims for Confidentiality) | |
| 57/23 | May 2, 2023 | General | Fifth Procedural Order in Respect of Manitoba Hydro’s 2023/24 And 2024/25 General Rate Application (Hearing Schedule, Adjudication of Claims for Confidentiality, and Recommendation of the Manitoba Industrial Power Users Group Regarding the Write-Off of Deferral Accounts) | |
| 42/23 | Apr 11, 2023 | General | Fourth Procedural Order in Respect of Manitoba Hydro's 2023/24 and 2024/25 General Rate Application (Hearing Schedule and Scope) | |
| 24/23 | Feb 23, 2023 | General | Third Procedural Order in Respect of Manitoba Hydro's 2023/24 and 2024/25 General Rate Application - Updated Hearing Timetable | |
| 9/23 | Jan 23, 2023 | General | Second Procedural Order in Respect of Manitoba Hydro's 2023/24 and 2024/25 General Rate Application - Disputed Information Requests | |
| 130/22 | Dec 8, 2022 | General | First Procedural Order in Respect of Manitoba Hydro's 2023/24 and 2024/25 General Rate Application |
Past
-
Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Public Presentations
-
Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Hearing Commences
-
Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Pre-Hearing Conference
-
Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Part II GRA Filing Due
-
Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Amended Part I GRA Filing Due
-
Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Pre-Hearing Conference
-
Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Intervener Applications Due
-
Manitoba Hydro – 2023/24 & 2024/25 General Rate Application and Review and Vary Directives 19 & 27 of Board Order 101/23 – Part I GRA Filing Due
| Title | Archived | Type | ||
|---|---|---|---|---|
| Public Notice – Manitoba Hydro 2023/24 and 2024/25 General Rate Application | Nov 15, 2022 | Archived | Public Notice |